Blind teaser · Package AB-35
Package AB-35: about 3–5 MW of flared gas
Southern Alberta · gas that is flared or vented today, mostly not yet generator-ready on its own. Operator and sites are disclosed under the PermianChain mandate and NDA.
Send inquiry3–5 MW
Gas now flared or vented
US$61/MWh
Estimated all-in power cost (not a market price)
12 of 12
Months with gas flowing
- Region
- Southern Alberta
- Gas now flared or vented
- 3–5 MW of power equivalent
- Steady and sweet (generator-ready)
- 0–1 MW · about 10 GWh a year
- Sites
- 1–2 within about 5 km · largest 2–3 MW
- Gas quality
- 20% of volume steady · 20% sweet
- Counterparties
- one producer
- Upside nearby
- about 3–5 MW of recently shut-in gas wells within 15 km (restart is the producer's call)
Monthly flow, share of the 12-month average
Who it fits
- Pooled with nearby packages for larger deals
Indicative economics (our estimates, not market prices)
We estimate power at the site costs about US$61/MWh all-in for mining (gas, O&M and generators paid back over 5 years) and about US$74.5/MWh as firm power with N+1 generators for AI / HPC. No grid connection is needed: Alberta's interim data-centre grid allocation is full and Saskatchewan requires new data centres to supply their own power.
Indicative only, not an offer. Volumes from public Petrinex data, Oct 2025 to Sep 2026; sizes shown as ranges. Costs use planning assumptions (gas C$1.50/GJ, generators C$1,300/kW, US$1 = C$1.39) and will be replaced by vendor quotes. The producer has not committed any volume.