Blind teaser · Package SK-11
Package SK-11: 3–5 MW of wellsite gas power
West-central Saskatchewan · gas that is flared or vented today, available for on-site power. Operator and sites are disclosed under the PermianChain mandate and NDA.
Send inquiry3–5 MW
Steady, sweet gas power
US$61/MWh
Estimated all-in power cost (not a market price)
12 of 12
Months with gas flowing
- Region
- West-central Saskatchewan
- Gas now flared or vented
- 3–5 MW of power equivalent
- Steady and sweet (generator-ready)
- 3–5 MW · about 20 GWh a year
- Sites
- 3–5 within about 15 km · largest 2–3 MW
- Gas quality
- 70% of volume steady · 100% sweet
- Counterparties
- 2 producers, the lead holding about 90% of the gas
Monthly flow, share of the 12-month average
Who it fits
- Bitcoin mining, 3–5 MW deployment (containers on site)
- Pooled with nearby packages for larger deals
Indicative economics (our estimates, not market prices)
We estimate power at the site costs about US$61/MWh all-in for mining (gas, O&M and generators paid back over 5 years) and about US$74.5/MWh as firm power with N+1 generators for AI / HPC. No grid connection is needed: Alberta's interim data-centre grid allocation is full and Saskatchewan requires new data centres to supply their own power.
Indicative only, not an offer. Volumes from public Petrinex data, Oct 2025 to Sep 2026; sizes shown as ranges. Costs use planning assumptions (gas C$1.50/GJ, generators C$1,300/kW, US$1 = C$1.39) and will be replaced by vendor quotes. The producer has not committed any volume.
Interested in package SK-11?
Tell us what you would run on it. We will follow up to arrange a call, and once the PermianChain mandate and NDA are signed you receive the operator, site list, gas analysis and 12-month volumes, and meet the producer.