Flare Atlas

Angola · 2025 data

Angola's stranded gas

In 2025, satellites detected 2.34 billion m³ of gas flared at 69 sites in Angola: energy burned off instead of put to work. That is 12% more than in 2024.

2.34
billion m³ flared
≈1,000 MW
average power
≈550,000
H100 GPUs
5.61
million t CO₂e

Gas flared in Angola, billion m³

Data table
Yearbcm flaredFlare sites
20123.63066
20133.58865
20143.96067
20155.00464
20166.07164
20174.21266
20183.07368
20192.40869
20201.72867
20211.84165
20221.60865
20231.94466
20242.08467
20252.34269

Share this card

Angola's stranded gas: 2.34 bcm flared in 2025, about 1,000 MW or 550,000 H100 GPUs.Download card (JPG)

Have flared or stranded gas?

We assess energy assets for on-site power and modular compute.

Method and sources

  • Flared volumes: World Bank Global Flaring and Methane Reduction Partnership (GFMR), NOAA and the Payne Institute at the Colorado School of Mines, flare volume estimates by individual flare location (2012–2025, 2026 release). They are satellite (VIIRS) estimates: venting and flares too small to detect are not included.
  • Regions: countries as the World Bank assigns them. Alberta, the Permian Basin and the Bakken are latitude/longitude boxes around each area, so they are approximate.
  • Power: gas at 1030 Btu/scf burned in reciprocating engines at 35% efficiency, averaged over the year. This is the same method as our gas-to-power calculator, where you can change every assumption.
  • GPUs: NVIDIA DGX H100 maximum system power, plus 10% for networking and storage, at a PUE of 1.3.
  • Emissions: 2.4 million tonnes CO₂e per bcm flared, from the World Bank's 2026 Global Gas Flaring Tracker (about 400 Mt from 167 bcm in 2025).
  • These are indicative estimates, not an engineering assessment of any site.