Flare Atlas

Argentina · 2025 data

Argentina's stranded gas

In 2025, satellites detected 0.73 billion m³ of gas flared at 324 sites in Argentina: energy burned off instead of put to work. That is 19% less than in 2024.

0.73
billion m³ flared
≈310 MW
average power
≈170,000
H100 GPUs
1.75
million t CO₂e

Gas flared in Argentina, billion m³

Data table
Yearbcm flaredFlare sites
20120.273162
20130.329181
20140.361197
20150.318208
20160.262194
20170.285201
20180.460247
20190.756263
20200.653270
20210.725281
20220.699284
20230.677272
20240.906299
20250.733324

Share this card

Argentina's stranded gas: 0.73 bcm flared in 2025, about 310 MW or 170,000 H100 GPUs.Download card (JPG)

Have flared or stranded gas?

We assess energy assets for on-site power and modular compute.

Method and sources

  • Flared volumes: World Bank Global Flaring and Methane Reduction Partnership (GFMR), NOAA and the Payne Institute at the Colorado School of Mines, flare volume estimates by individual flare location (2012–2025, 2026 release). They are satellite (VIIRS) estimates: venting and flares too small to detect are not included.
  • Regions: countries as the World Bank assigns them. Alberta, the Permian Basin and the Bakken are latitude/longitude boxes around each area, so they are approximate.
  • Power: gas at 1030 Btu/scf burned in reciprocating engines at 35% efficiency, averaged over the year. This is the same method as our gas-to-power calculator, where you can change every assumption.
  • GPUs: NVIDIA DGX H100 maximum system power, plus 10% for networking and storage, at a PUE of 1.3.
  • Emissions: 2.4 million tonnes CO₂e per bcm flared, from the World Bank's 2026 Global Gas Flaring Tracker (about 400 Mt from 167 bcm in 2025).
  • These are indicative estimates, not an engineering assessment of any site.