Flare Atlas

Indonesia · 2025 data

Indonesia's stranded gas

In 2025, satellites detected 0.89 billion m³ of gas flared at 276 sites in Indonesia: energy burned off instead of put to work. That is 3% less than in 2024.

0.89
billion m³ flared
≈380 MW
average power
≈210,000
H100 GPUs
2.13
million t CO₂e

Gas flared in Indonesia, billion m³

Data table
Yearbcm flaredFlare sites
20122.265246
20131.843247
20141.581280
20151.496277
20161.520267
20171.236253
20181.174295
20191.139311
20200.920282
20210.766273
20220.785266
20231.030298
20240.917283
20250.888276

Share this card

Indonesia's stranded gas: 0.89 bcm flared in 2025, about 380 MW or 210,000 H100 GPUs.Download card (JPG)

Have flared or stranded gas?

We assess energy assets for on-site power and modular compute.

Method and sources

  • Flared volumes: World Bank Global Flaring and Methane Reduction Partnership (GFMR), NOAA and the Payne Institute at the Colorado School of Mines, flare volume estimates by individual flare location (2012–2025, 2026 release). They are satellite (VIIRS) estimates: venting and flares too small to detect are not included.
  • Regions: countries as the World Bank assigns them. Alberta, the Permian Basin and the Bakken are latitude/longitude boxes around each area, so they are approximate.
  • Power: gas at 1030 Btu/scf burned in reciprocating engines at 35% efficiency, averaged over the year. This is the same method as our gas-to-power calculator, where you can change every assumption.
  • GPUs: NVIDIA DGX H100 maximum system power, plus 10% for networking and storage, at a PUE of 1.3.
  • Emissions: 2.4 million tonnes CO₂e per bcm flared, from the World Bank's 2026 Global Gas Flaring Tracker (about 400 Mt from 167 bcm in 2025).
  • These are indicative estimates, not an engineering assessment of any site.