ExxonMobil (XTO Energy)pilot Part of ExxonMobil (NYSE: XOM) Bakken, North Dakota (Jorgenson Deep Creek site reported), United States
合作伙伴 Crusoe Energy 用途 bitcoin mining 天然气 flare 容量 — 起始时间 2021-01 United States境内归属于 ExxonMobil 的火炬燃烧量:0.483 bcm(2020 年)→ 0.376 bcm(2025 年),−22%。
Up to 18 MMcf/month of gas; Exxon weighed expanding to Alaska, Nigeria, Argentina, Guyana, Germany (2022). No later status published.
来源 1 来源 2 (secondary) 认领您的主页
ConocoPhillipspilot NYSE: COP Bakken, North Dakota, United States
合作伙伴 undisclosed third-party bitcoin miner 用途 bitcoin mining 天然气 flare 容量 — 起始时间 2022 United States境内归属于 ConocoPhillips 的火炬燃烧量:0.372 bcm(2021 年)→ 0.267 bcm(2025 年),−28%。
Company statement (Feb 2022): one pilot selling would-be-flared gas to third-party-owned miner; part of zero routine flaring by 2030 goal.
来源 1 来源 2 (secondary) 认领您的主页
Equinorended OSE: EQNR · NYSE: EQNR Bakken, North Dakota, United States
合作伙伴 Crusoe Energy 用途 bitcoin mining 天然气 flare 容量 — 起始时间 — Sold excess gas and well-pad space to Crusoe; ended when Equinor divested its Bakken acreage in 2021 (Reuters, Oct 2021).
来源 1 来源 2 (secondary) 认领您的主页
Kraken Oil & Gasactive Bakken: 3 sites eastern Montana (incl. near Sidney) + 1 site North Dakota, United States
合作伙伴 Crusoe Energy 用途 bitcoin mining 天然气 flare 容量 — 起始时间 2020-10 United States境内归属于 KRAKEN RESOURCES 的火炬燃烧量:0.214 bcm(2019 年)→ 0.090 bcm(2025 年),−58%。
18 DFM modules at 4 sites; Sidney MT pad: 4 generators taking ~1.2 MMcf/d (June 2021). Status last reported 2021; Crusoe fleet sold to NYDIG 2025.
来源 1 来源 2 (primary) 认领您的主页
Enerpluspilot Part of Chord Energy (NASDAQ: CHRD) Bakken, North Dakota (two-well pad without pipeline), United States
合作伙伴 Crusoe Energy 用途 bitcoin mining 天然气 flare 容量 — 起始时间 2019 United States境内归属于 Chord Energy 的火炬燃烧量:0.789 bcm(2018 年)→ 0.111 bcm(2025 年),−86%。
Crusoe release (Aug 2019) quotes Enerplus VP: two-well pilot raised gas capture ~400,000 cf/d. Still listed as Crusoe client Oct 2021. Enerplus acquired by Chord Energy 2024 (wb_name = successor).
来源 (primary) 认领您的主页
Devon Energyunknown NYSE: DVN undisclosed (Crusoe ops in ND/MT/WY/CO), United States
合作伙伴 Crusoe Energy 用途 bitcoin mining 天然气 flare 容量 — 起始时间 — United States境内归属于 DEVON 的火炬燃烧量:0.355 bcm(2015 年)→ 0.170 bcm(2025 年),−52%。
Named only as a Crusoe client (Reuters Oct 2021); no site, date or volume disclosed.
来源 1 来源 2 (secondary) 认领您的主页
Wesco Operating, Inc.active Wyoming (site not named), United States
合作伙伴 EZ Blockchain 用途 bitcoin mining 天然气 flare 容量 1.00 MW 起始时间 2020-10 Flaring cut from 240,000 scf/d to 0; expanded to 1 MW total (Mar 2021 release). Status last reported 2021.
来源 1 来源 2 (primary) 认领您的主页
New West Data Corp.active Alberta (28 owned well sites; Grande Prairie project), Canada
合作伙伴 in-house 用途 bitcoin mining 天然气 stranded 容量 15 MW 起始时间 — Vertically integrated: buys producing wells with uneconomic gas and runs off-grid wellhead generation for mining; ~1,000 BOE/d and 15 MW (May 2026).
来源 1 来源 2 (primary) 认领您的主页
Entrada Resources Inc. (to be acquired by New West Data)announced near Rocky Mountain House, central Alberta, Canada
合作伙伴 New West Data 用途 both 天然气 stranded 容量 20 MW 起始时间 2026-05 LOI May 2026, close expected Q3 2026; +20 MW off-grid compute within ~9 months of close; plan to add HPC/AI beside bitcoin.
来源 1 来源 2 (primary) 认领您的主页
Proline Energy Resourcesunknown producing fields, Texas, United States
合作伙伴 Compute Village 用途 AI/HPC 天然气 flare 容量 — 起始时间 — Only source is partner website: modular GPU containers on flared/stranded wellhead gas, off-grid. No capacity or date given.
来源 (primary) 认领您的主页
New Era Helium (now New Era Energy & Digital)announced NASDAQ: NUAI Ector County near Odessa, Permian Basin, United States
合作伙伴 Sharon AI (JV Texas Critical Data Centers) 用途 AI/HPC 天然气 unknown 容量 250 MW 起始时间 2025-01 Gas-fired plant plus CCS on gas supplied by New Era's Permian production (agreement under negotiation); site uses gas transmission line, so not strictly on the wellsite. Target 100 MW by Dec 2026; Texas permit freeze Sep 2026 may delay.
来源 1 来源 2 来源 3 (primary) 认领您的主页
Chevronannounced NYSE: CVX West Texas, Permian Basin, United States
合作伙伴 Engine No. 1 / GE Vernova (end user reported: Microsoft) 用途 AI/HPC 天然气 unknown 容量 2,500 MW 起始时间 2027 United States境内归属于 Chevron 的火炬燃烧量:0.144 bcm(2025 年)→ 0.144 bcm(2025 年),+0%。
Off-grid gas plant fed by Chevron's own Permian gas; ~2.5 GW initial, expandable to 5 GW; power targeted 2027. Large grid-bypass power plant, not flare capture.
来源 1 来源 2 来源 3 (secondary) 认领您的主页
Diversified Energyannounced NYSE: DEC · LSE: DEC Appalachian Basin (VA, WV, KY), United States
合作伙伴 FuelCell Energy / TESIAC 用途 AI/HPC 天然气 wellhead/other 容量 360 MW 起始时间 2025-03 Up to 360 MW off-grid fuel-cell power for data centers from Diversified's own natural gas plus captured coal mine methane. Not flare gas.
来源 1 来源 2 (primary) 认领您的主页
Tecpetrolactive Part of Techint Group / San Faustin (private) Los Toldos II Este, Vaca Muerta, Neuquén, Argentina
合作伙伴 Unblock (Crusoe data centers) 用途 bitcoin mining 天然气 flare 容量 12 MW 起始时间 2023-12 Argentina境内归属于 Tecpetrol 的火炬燃烧量:0.004 bcm(2022 年)→ 0.004 bcm(2025 年),新增。
Signed Jun 2023; 8 x 1.5 MW Jenbacher gensets (12 MW) on ~50,000 m3/d, operating since Dec 2023. Let extended well testing go ahead (oil 50 to 300 m3/d). Columbia CCSI/Capterio case study, Jun 2025.
来源 1 来源 2 来源 3 (primary) 认领您的主页
Pluspetrolpilot Loma Jarillosa Este, Vaca Muerta, Neuquén, Argentina
合作伙伴 Unblock / Crusoe Energy 用途 bitcoin mining 天然气 associated 容量 — 起始时间 2023-07 Argentina境内归属于 Pluspetrol 的火炬燃烧量:0.113 bcm(2022 年)→ 0.032 bcm(2025 年),−71%。
Reported as test of digital flare mitigation (Jul 2023); Feb 2024 report cites ~2,200 tCO2e/yr avoided. Unblock lists Pluspetrol as a client.
来源 1 来源 2 (secondary) 认领您的主页
YPF (UTE Bajo del Toro: YPF, Equinor, YPF Luz)active JV: YPF (BYMA: YPFD · NYSE: YPF) Bajo del Toro thermal plant, Rincón de los Sauces, Neuquén (Vaca Muerta), Argentina
合作伙伴 Genesis Digital Assets (GDA) 用途 bitcoin mining 天然气 flare 容量 7.00 MW 起始时间 2024-05 Argentina境内归属于 YPF 的火炬燃烧量:0.314 bcm(2023 年)→ 0.315 bcm(2025 年),+0%。
7 MW installed plus 1 MW backup (some outlets say 8 MW) on flare gas from YPF operations; GDA data center inside the plant. Reports disagree on 1,200 vs 12,000 miners.
来源 1 来源 2 来源 3 (primary) 认领您的主页
Phoenix Global Resourcespilot Part of Mercuria Energy Group (private) Vaca Muerta, Mendoza, Argentina
合作伙伴 Giga Energy / Exa Tech 用途 bitcoin mining 天然气 flare 容量 2.00 MW 起始时间 2023-12 Argentina境内归属于 Phoenix Global Resources 的火炬燃烧量:0.003 bcm(2022 年)→ 0.014 bcm(2025 年),新增。
2 MW test facility mining since Dec 2023 (CNBC Mar 2024). No later status found.
来源 1 来源 2 (secondary) 认领您的主页
Petrobrasannounced B3: PETR4 · NYSE: PBR not disclosed (R&D), Brazil
合作伙伴 Cenpes / Petrobras University / Ledger Labs PUC-Rio 用途 bitcoin mining 天然气 associated 容量 — 起始时间 2025-01 Brazil境内归属于 Petrobras 的火炬燃烧量:0.595 bcm(2024 年)→ 0.724 bcm(2025 年),+22%。
R&D project on blockchain incl. mining on associated gas; no site deployment confirmed.
来源 1 来源 2 (secondary) 认领您的主页
OML 30 JV (NNPC E&P, Heritage Energy/HEOSL, Shoreline)announced JV: NNPC Ltd (Nigerian state) OML 30, Delta State (3 sites), Nigeria
合作伙伴 Green Flare Holdings / Dawcon Energy 用途 bitcoin mining 天然气 flare 容量 53 MW 起始时间 2025 Nigeria境内归属于 NNPC 的火炬燃烧量:0.417 bcm(2024 年)→ 0.505 bcm(2025 年),+21%。
Gas Connection Agreement under Nigerian Gas Flare Commercialisation Programme; civil works started; aimed for 2 sites live by end-2025, no energization confirmed. wb_name is NNPC parent (JV partner, not operator).
来源 1 来源 2 来源 3 (secondary) 认领您的主页
Bengal Energy (wells with partners Santos, Bridgeport Energy)pilot TSX: BNG Cooper Basin, Queensland, Australia
合作伙伴 in-house (mobile 'donga' unit) 用途 bitcoin mining 天然气 stranded 容量 — 起始时间 2022-03 ~66-70 rigs on stranded gas wells awaiting pipeline (reported Mar 2022). Outcome not reported.
来源 1 来源 2 (secondary) 认领您的主页