20 producers in 6 countries that have used gas at their sites to generate power on site for bitcoin mining or AI and HPC compute, 5 of them active. From public announcements, filings and case studies; each entry links to its source. Where the producer appears in the flare data, we show how its flaring in that country has changed since the project started: context, not proof that the project caused the change.
Projects
Status
Use
20 of 20 projects
ExxonMobil (XTO Energy)pilot
Part of ExxonMobil (NYSE: XOM)
Bakken, North Dakota (Jorgenson Deep Creek site reported), United States
Partner
Crusoe Energy
Use
bitcoin mining
Gas
flare
Capacity
—
Since
2021-01
Flaring attributed to ExxonMobil in United States: 0.483 bcm (2020) → 0.376 bcm (2025), −22%.
Up to 18 MMcf/month of gas; Exxon weighed expanding to Alaska, Nigeria, Argentina, Guyana, Germany (2022). No later status published.
Bakken, North Dakota (two-well pad without pipeline), United States
Partner
Crusoe Energy
Use
bitcoin mining
Gas
flare
Capacity
—
Since
2019
Flaring attributed to Chord Energy in United States: 0.789 bcm (2018) → 0.111 bcm (2025), −86%.
Crusoe release (Aug 2019) quotes Enerplus VP: two-well pilot raised gas capture ~400,000 cf/d. Still listed as Crusoe client Oct 2021. Enerplus acquired by Chord Energy 2024 (wb_name = successor).
New Era Helium (now New Era Energy & Digital)announced
NASDAQ: NUAI
Ector County near Odessa, Permian Basin, United States
Partner
Sharon AI (JV Texas Critical Data Centers)
Use
AI/HPC
Gas
unknown
Capacity
250 MW
Since
2025-01
Gas-fired plant plus CCS on gas supplied by New Era's Permian production (agreement under negotiation); site uses gas transmission line, so not strictly on the wellsite. Target 100 MW by Dec 2026; Texas permit freeze Sep 2026 may delay.
Engine No. 1 / GE Vernova (end user reported: Microsoft)
Use
AI/HPC
Gas
unknown
Capacity
2,500 MW
Since
2027
Flaring attributed to Chevron in United States: 0.144 bcm (2025) → 0.144 bcm (2025), +0%.
Off-grid gas plant fed by Chevron's own Permian gas; ~2.5 GW initial, expandable to 5 GW; power targeted 2027. Large grid-bypass power plant, not flare capture.
Los Toldos II Este, Vaca Muerta, Neuquén, Argentina
Partner
Unblock (Crusoe data centers)
Use
bitcoin mining
Gas
flare
Capacity
12 MW
Since
2023-12
Flaring attributed to Tecpetrol in Argentina: 0.004 bcm (2022) → 0.004 bcm (2025), new.
Signed Jun 2023; 8 x 1.5 MW Jenbacher gensets (12 MW) on ~50,000 m3/d, operating since Dec 2023. Let extended well testing go ahead (oil 50 to 300 m3/d). Columbia CCSI/Capterio case study, Jun 2025.
YPF (UTE Bajo del Toro: YPF, Equinor, YPF Luz)active
JV: YPF (BYMA: YPFD · NYSE: YPF)
Bajo del Toro thermal plant, Rincón de los Sauces, Neuquén (Vaca Muerta), Argentina
Partner
Genesis Digital Assets (GDA)
Use
bitcoin mining
Gas
flare
Capacity
7.00 MW
Since
2024-05
Flaring attributed to YPF in Argentina: 0.314 bcm (2023) → 0.315 bcm (2025), +0%.
7 MW installed plus 1 MW backup (some outlets say 8 MW) on flare gas from YPF operations; GDA data center inside the plant. Reports disagree on 1,200 vs 12,000 miners.
Flaring attributed to NNPC in Nigeria: 0.417 bcm (2024) → 0.505 bcm (2025), +21%.
Gas Connection Agreement under Nigerian Gas Flare Commercialisation Programme; civil works started; aimed for 2 sites live by end-2025, no energization confirmed. wb_name is NNPC parent (JV partner, not operator).